Artvin Center Ortaköy Viaduct
Task
Within the scope of "Artvin Merkez Ortaköy Viaduct Project Construction Work", balanced cantilever type bridge application projects have been prepared. Its total span is 154.4 m and its superstructure is prepared as post-tensioned concrete. The bridge was built with the balanced cantilever method by advancing in sections on both sides over a single middle pier. The height is 69 m from the top foundation level and the maximum superstructure body height is 9 m.